Tuesday, November 10, 2009

NOV 09 Practice Film Working with Film Group

9th November

My group and I made a practice film.

We followed a Shot List for a short film called: 'The Wrong Day'.

Myles = Sound

Luke = Cameraman (Sony Z1)

Ciaran = Actor

Mike = Producer

Alfred = Director

Director = 'Stand By'

Crew = 'Standing By'

Director = 'Run to Record'.

Cameraman = 'Recording'.

Director = 'Action'.

Director = 'Cut'.

Shot List for 'The Wrong Day'.

LOCATION: Newton Park Campus, Newton St Loe, Bath BA2 9BN

Set up 1 The Gate House, inside room GH201

SLUG LINE: Scene 2 INT. Classroom -Day

02.01 LS John enters the room and sits down facing whiteboard.

02.02 MS John looks around the room.

02.03 POV empty chairs left.

02.04 POV empty chairs right.

02.05 MS John reaches into pocket.

02.06 CU hand enters pocket and pulls out mobile phone.

02.07 CU John looking at phone.

02.08 POV ECU front of phone.

02.09 CU John looking down (Phone POV).

Set up 2 The Gatehouse, outside GH201

SLUG LINE: Scene 1-INT. Newton building -Day

01.01 CU hand on door handle.

01.02 MS John opens door and enters room, leaving shot.

Some how, my Film Group and I swapped 02.08 and 02.09 around. 02.08 we used as 02.09. 0209, we used as 02.08.

No comments:

Post a Comment